国产精品免费麻豆入口丨久久99精品久久久久久琪琪丨老汉色老汉首页a亚洲丨亚洲日本va中文字幕久久丨欧美精品毛片久久久久久久

電蒸汽鍋爐安裝注意事項

1、電蒸汽鍋爐http://www.scsuntao.cn/及其輔機、水處理設備等的安裝應符合設備制造廠的技術要求,設備基礎必須待設備到貨并與設計圖紙核對無誤后,方可施工。
Installation of electric steam boilers and auxiliary equipment, water treatment equipment, etc. shall comply with the technical requirements of equipment manufacturers, equipment foundation must be after the arrival of equipment and design drawings and check and correct, before construction.

2、電蒸汽鍋爐管道最高點放氣、最低點放水。
Electric steam boiler tubes deflate the highest point, the lowest point of water.

3、電蒸汽鍋爐管道安裝后的試壓驗收,按《工業金屬管道工程施工及驗收規范》進行。
Pressure test after acceptance electric steam boiler pipe installation, according to the "industrial metal pipeline construction and acceptance of" conduct.

4、電蒸汽鍋爐http://www.scsuntao.cn/鍋爐房內所有用電設備及蓄熱裝置等都應可靠接地。
Should be grounded electric steam boilers and boiler room all electrical equipment thermal storage devices.


下一篇:電熱水鍋爐燃燒器如何進行保養?
上一篇:電蒸汽鍋爐的日常維護、保養

熱門產品推薦